Installation
An elevator doesn't get installed — it gets coordinated. Drawings, factory, logistics, customs, civil works, schedule: dozens of threads that all have to land in concert. The real cost of a slipped installation is rarely the equipment. We hold the chain together so the building opens when it should.
Pre-engineering and manufacturer engineering with coordinated client approval
Sourcing, international logistics and customs across the supply chain
On-site assembly, alignment and adjustment
Testing, commissioning and certified acceptance against client, site, safety and interface requirements